PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Closed up Wall forms along L Line Facing South-West (800x600).jpg Protecting net around the excavated area Facing South-East (800x600).jpg Setting up the Shear Walls at Elev. 5-6 2nd Floor Facing South-East (800x600).jpg Closed up wall froms Facing South-East (800x600).jpg Excavated area between G-K and 5 Line  Facing South-West (800x600).jpg
Next page Closed up Wall forms along L Line Facing South-West (800x600)
Closed up Wall forms along L Line Facing South-West (800x600)